Differences between revisions 29 and 30
Revision 29 as of 2009-05-06 08:57:39
Size: 1339
Editor: EldZierau
Comment:
Revision 30 as of 2009-05-06 11:45:06
Size: 1186
Editor: EldZierau
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
[[Anchor(MainProcesses)]] The development methodology described here is inspired by CMMI (http://www.sei.cmu.edu/cmmi/). It will be described in form of [#Processes processes] and [#Roles roles].

The processes are either main processes or sub processes covered by a main process. Main processes includes an overview and the processes and roles involved. Sub processes includes decription, purpose, therole repsonsible, the method used in form of activities, the time it takes place and its input and output.

The roles includes description, the processes the role is responsible for, guidelines relevant for the role, refereces to current work and backup staffing list.

[[Anchor(Processes)]]
Line 7: Line 13:
Line 10: Line 15:
Below is only given the main processes. Other ways to find a process is
 * '''''Alphabetic''''' [:ProcessList:list of processes]
 * Full '''''structure''''' document of [:Process:All Processes]
To get page will all process descriptions in structured form, please refer to [:Process:All Processes].
Line 14: Line 17:
Main Processes:
 * ~+[:Process/Overall_Steering_Processes:Overall Steering Processes]+~
 * ~+[:Process/Iteration_Lifecycle:Iteration Life-Cycle]+~
 * ~+[:Process/Tracker_Issue_Lifecycle:Tracker Issue Life-Cycle]+~
 * ~+[:Process/Continuous_QA:Contiously Quality Assurance]+~
[[Include(Process/ProcessList_WithoutTitle)]]
Line 24: Line 23:
Below is given links to role descriptions in alphabetic order. To get page will all role description , please refer to [:Process_Role:All Roles page]. To get page will all role descriptions, please refer to [:Process_Role:All Roles page].
Line 26: Line 25:
 * ~+[:Process_Role/Project_Leader:Project Leader]+~
 * ~+[:Process_Role/Module_Owner:Module Owner]+~
 * ~+[:Process_Role/External_SW_Coordinator:External Software Coordinator]+~
 * ~+[:Process_Role/Configuration_Coordinator:Configuration Coordinator]+~
 * ~+[:Process_Role/QA_Coordinator:Quality Assurance Coordinator]+~
 * ~+[:Process_Role/Documentation_Coordinator:Documentation Coordinator]+~
 * ~+[:Process_Role/Test_Coordinator:Test Coordinator]+~
[[Include(Process_Role/RolesList_WithoutTitle)]]

Anchor(Methodology)

Development Methodology

Action(edit)

The development methodology described here is inspired by CMMI (http://www.sei.cmu.edu/cmmi/). It will be described in form of [#Processes processes] and [#Roles roles].

The processes are either main processes or sub processes covered by a main process. Main processes includes an overview and the processes and roles involved. Sub processes includes decription, purpose, therole repsonsible, the method used in form of activities, the time it takes place and its input and output.

The roles includes description, the processes the role is responsible for, guidelines relevant for the role, refereces to current work and backup staffing list.

Anchor(Processes)

Processes

Include(Process/Intro_WithoutTitle)

To get page will all process descriptions in structured form, please refer to [:Process:All Processes].

Include(Process/ProcessList_WithoutTitle)

Anchor(Roles)

Roles

Include(Process_Role/Intro_WithoutTitle)

To get page will all role descriptions, please refer to [:Process_Role:All Roles page].

Include(Process_Role/RolesList_WithoutTitle)

Development/Methodology (last edited 2010-08-16 10:24:32 by localhost)