Differences between revisions 34 and 35
Revision 34 as of 2009-08-05 15:15:47
Size: 1374
Comment:
Revision 35 as of 2009-08-05 15:22:30
Size: 1386
Comment:
Deletions are marked like this. Additions are marked like this.
Line 28: Line 28:
To get page will all role descriptions, please refer to [:Process Role:All Roles page]. To get the page with descriptions of all our roles, please refer to [:Process Role:All Roles page].

Anchor(Methodology)

Development Methodology

Action(edit)

The development methodology described here is inspired by CMMI (http://www.sei.cmu.edu/cmmi/). It will be described in form of [#Processes processes] and [#Roles roles].

The processes are either main processes or subprocesses covered by a main process. Each main process includes an overview and the processes and roles involved. Each subprocess includes a description, a purpose, the role responsible for the subprocess, the method used in form of activities, the time it takes place and its input and output.

Each role includes a description, the processes the role is responsible for, and the guidelines relevant for the role, any references to current work and backup staffing list.

To insert a new process or role description, please refer to the [:Guidelines/NewProcess:Guidelines for Writing a new Process or Role].

Anchor(Processes)

Processes

Include(Process/Intro_WithoutTitle)

To get page will all process descriptions in structured form, please refer to [:Process:All Processes].

Include(Process/ProcessList_WithoutTitle)

Anchor(Roles)

Roles

Include(Process_Role/Intro_WithoutTitle)

To get the page with descriptions of all our roles, please refer to [:Process Role:All Roles page].

Include(Process_Role/RoleList_WithoutTitle)

Development/Methodology (last edited 2010-08-16 10:24:32 by localhost)