Task list and timetable for iteration 36

Status

OK/Not Ok

1. Highlights approved

OK

2. Assignment of tasks

OK

3. Task list and time table approved

OK

4. Implementation phase started

OK

5. Release test phase started

OK

6. Assignment phase for next iteration started

OK

7. Iteration 36 completed

OK

Highlights for Iteration

Development procedure

Table of tasks

Tasks for iteration 36. Updated 26-5-2009

Estimate md

Main responsible

Other participants

SVC/ md

KFC/ md

ELZI/ md

CSR/ md

TLR/ md

Remaining md at 26-5-2009

Status

Implementation phase (task x-n)

Open Source+ Infrastructure+ bugs and feature request

Total 5

-

-

SVC/ md

KFC/ md

ELZI/ md

CSR/ md

TLR/ md

Total 0

-

Support of Open Source Release

1. Support of released NetarchiveSuite

2

See watchman list

-

0

Ongoing

2. Finalise the bug reporting procedure for the Gforge bug tracker. See summary from joint meeting.

1

ELZI

SVC

0

OK.

3. Finalise the Process description of external patches

2

ELZI

SVC

0

See task 2.

Prioritized bugs according to list from November the 10th 2008 '

SubTotal 21,5

Main responsible

Other participants

SVC/ md

KFC/ md

ELZI/ md

CSR/ md

TLR/ md

SubTotal 0

-

4.QA: Bug 1152 URLs with { or } not browsable.

2

CSR

SVC

0

OK.

5.Harvester stability: Bug 934 could not start harvester due to JMX problem (Adress already in use)

2

SVC

JOLF

0

OK.

6. Harvester stability: Bug 1154 Timeout kills non finished job because harvester gets stuck?

0

0

Won't fix

7.Harvester stability: Bug 1171Heritrix initialization errors are not caught by JMXHeritrixController

0

0

Invalid

8.Harvester stability: Bug 1174 Poor error message on dead job .

0

0

Postponed Fixed when bug 1188 is fixed

9.Harvester stability: Bug 1188 Heritrix side exceptions on JMX calls are ignored.

3

CSR

SVC

0

Postponed

10.Harvester stability: Bug 1249 Heritrix puts itself into PAUSED mode if it encounteres an OOM exception.

1

SVC

CSR

0

Won't fix because it's not possible to reproduce the error.

11.Harvester stability: Bug 1336 Harvester job dies suddenly.

1

CSR

SVC

0

OK.

12.Harvest configuration: Bug 688 hosts-report should be IDNA decoded when writing harvestInfo to the DB.

3

SVC

CSR

0

Postponed Bug 596 and 597 will also be fixed. Started and will be tested by unit test only.

13.Harvest configuration: Bug 928 The guess of initial size of unharvested domains is very bad on harvests with a large object limit.

0

0

Postponed Fixed when bug 1281 is fixed

14.Harvest configuration: Bug 1226 Discrepancy between how our database are defined in the dev, and prod environments respectively.

1

SVC

CSR

0

OK.

15.Harvest configuration: Bug 1281 Current default value for errorFactorBestGuess is greater than errorFactorPrevResult.

1

CSR

SVC

0

Postponed

16.Archive: Bug 574 When parsing checksum in ArcRepository we do strange things on wrong results.

2

ELZI

SVC

0

OK

17.Archive: Bug 1193 Exceptions from FileBatchJob stop batch job processing.

0,5

SVC

JOLF

0

OK

18.Documentation: Bug 1069 Set up proxy in Installation manual.

1,5

SVC

CSR

0

Postponed

19.Documentation: Bug 1266 UserManual: missing screendump desc for new field in "Adding seeds to an event harvest".

0,5

TLR

0

OK.

20.Documentation: Bug 1484 Document that we are not entirely platform independent in installation manual.

0,5

SVC

ELZI

0

Last review in Release test

21.Dev help: Bug 662 Vi smider SQL exception info væk.

2,5

CSR

SVC

0

OK

22. Information: Bug 1260 Too much and wrong feedback information on "Missing pages".

0

0

Postponed

23.Information: Bug 1492 The "Missing Files" page repeats the "status" headline.

1

ELZI

SVC

0

OK

23x.New. Bug 1566 Several Deduplicating processes started by error - only one should be possible

?

SVC

CSR

0

OK

23y.New. Bug 1605 Problems indexingen

?

JOLF

SVC

0

Postponed. Needs more information

Prioritized Feature Requests according to list from November the 10th 2008

SubTotal 7

Main responsible

Other participants

SVC/ md

KFC/ md

ELZI/ md

CSR/ md

TLR/ md

SubTotal 0

-

24.Harvester monitoring: Feature request 1497 Button in NetarchiveSuite. Insert button in NetarchiveSuite UI to invoke Heritrix UI.

0,5

SVC

JOLF

0

OK

25.QA: Feature request 623 We need to normalize URLs when browsing data.

1

CSR

ELZI

0

Postponed Trivial cases is solved by fixing bug 1152. Assignment for the remaining parts will be the task instead.

26.QA: Feature request 680 Cannot browse harvested password protected material.

2

SVC

ELZI

0

Postponed Implementation postponed. Assigments is written instead.

27.Documentation: Feature request 1389 Installation Manual should document the need to set the maximum number of producers on JMS broker.

0,5

SVC

ELZI

0

Last review in Release test

28.Dev help: Feature request 1101 Should upgrade to using Java 1.6.

0

0

Fixed

29.Dev help: Feature request 1252 Upgrade to Apache Derby 10.4.1.3.

3

SVC

0

OK

30.Dev help: Feature request 1436 Find replacement for com.sun.jndi.rmi.registry.RegistryContextFactory.

1

CSR

SVC

0

Postponed

31.Information: Feature request 1482 Harvest information for job must report if there are problems in getting.

0

0

This FR will be included in the batch assignment under the Archive assignment section

32.Information: Feature request 1483 Alternative monitor plugin could be print of jmx url.

0

0

Fixed

33.Information: Feature request 1485 File must be streamed instead on QA/QA-crawlloglines.jsp .

0

0

Fixed

33x. NEW Dev. help: Feature request 1643 Update Heritrix to version 1.14.3.

0

0

Fixed

Roadmap tasks. Stable release 3.8.

Total 11

Main responsible

Other participants

SVC/ md

KFC/ md

ELZI/ md

CSR/ md

TLR/ md

Total 0

-

34. Finalize Assignment group B.2 - Improve and isolate bit preservation GUI

0,5

ELZI

KFC

0

OK

35. Finalize assignment for Assignment group B.4.4 - Yet more better infrastructure

2

ELZI

SVC

0

Postponed

36. Write assignment for integration of Wayback. Includes analyse of the future requirements for index handling

2,5

CSR

SVC

0

OK.

36a. Task P1.1.1: Identify subset of CDX files for pre-prototype resourceIndex testing

1

CSR

SVC

x

For Task 36a-36e missing 3 md for implementation and 1 md for review. Start of release test depends not on finalizing task 36a-36e.

36b. Task P1.1.2: Configure a prototype resourceIndex tester

1

CSR

SVC

x

See task 36a.

36c. Task P1.1.3: pre-prototype resourceIndex performance testing

3

CSR

SVC

x

See task 36a.

36d. Task P1.1.4: identify requirements for WBS resourceIndex server

3

CSR

SVC

x

See task 36a.

36e. Task P1.1.5: configure prototype resourceIndex server

2

CSR

SVC

x

See task 36a.

37. Write assignment for new deploy. See proposal from KFC.

2,5

ELZI

SVC

x

See task 36a

38. Implement new deploy.

??

JOLF

ELZI

0

OK.

39. Assigment for support of WARC format.

3,5

SVC

CSR

0

Postponed

Other tasks calculated as implementation tasks

Total 3,5

Main responsible

Other participants

SVC/ md

KFC/ md

ELZI/ md

CSR/ md

TLR/ md

Total 0

-

40. KFC tasks before December the 1st, 2008

1

KFC

All

0

..

41. Test/integrate review tool Crucible

1

SVC

CSR

0

OK. Crucible is operational. See Process documentation

42. Update of manuals

1

ELZI

All

0

OK.

43. Role management

0,5

-

On going

44. Update of deduplication section in developer manual

2

SVC

ELZI

0

OK

45. Specification of current and future requirements for development test platform

0,5

TLR

CSR

In progress

46. Installation and test of configuration of new KB Bit platform

2

TLR

CLO

On going.

47. Update of deploy to support new KB Bit platform

0,5

ELZI

TLR

On going

Prepare release test of Iteration 36

48. Prepare release test.

6

TLR

All

0

OK

Total md implementation phase (Task 1-44)

Total 48

-

-

14

18

20

0

6

Total 0

-

Release test phase (task 20-22)

Release test

Total 9

Main responsible

Other participants

-

-

-

-

-

Total 0

-

49. Execute release test.

6

TLR

CSR,JOLF,ELZI,SVC

1

1

1

3

0

Started

50. Component bug/feature fix/management

2,5

QA

CSR,JOLF,ELZI,SVC

1

0,5

1

0

..

Release notes

Total 0,5

-

-

SVC/ md

KFC/ md

ELZI/ md

NN/ md

TLR/ md

Total 0,5

-

51. Write release notes for iteration 36

0,5

SVC

CSR

0,5

0,5

-

Total for release test phase

Total 5.5

-

-

2

2

2

0

3

Total 4,5

-

Assignment phase for next iteration (task 23-27)

52. Component bug/feature fix/management

1,5

QA

All

0,5

0,5

0,5

1,5

Regular process

53. Define goals for Iteration 37 task list.

0,1

CHH

CSR

0,1

0,1

-

54. Presentation of goals and tasks for Iteration 37. Achieve a common understanding of the purpose of the iteration and each task on status meeting

0,1

CSR

All

0,1

0,1

-

55. Assignment of tasks, bugs and feature request

3

CHH

All

1

1

1

3

Regular process

56. Update release test procedure

1

TLR

All

1

Regular process

Available man-days for assigment phase

Total 63

-

-

6

6

2

6

2

Total 64,5

-

Detailed timetable

Iteration36DetailedTimetable (use template IterationDetailedTimetableTemplate (TBD))

Timetable

Timetable iteration 36 Updated 10-2-2009

Start time

End time

Responsible

Baseline 24-10-2008. Start time

Baseline 24-10-2008. End time

1. Implementation of decided tasks

17-11-2008

15-04-2009

-

17-11-2008

16-02-2009

2. Code freeze. Create the build for release test and notify when build is ready

16-4-2009

-

SVC

16-2-2009

-

3. Release test

20-04-2009

25-5-2009

TLR

17-02-2009

19-02-2009

4. Code unfreeze

25-5-2009

-

SVC

20-02-2009

-

5. Assignments, bug components and bug fixes

26-5-2009

9-6-2009

20-02-2009

22-02-2009