Differences between revisions 12 and 13
Revision 12 as of 2009-05-14 09:45:12
Size: 947
Editor: EldZierau
Comment:
Revision 13 as of 2009-05-15 08:02:59
Size: 736
Editor: EldZierau
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
The overall steering process contains [#OverallSCOverview Overview], [#OverallSCProcesses Processes], [#OverallSCRoles Roles].

[[Anchor(OverallSCOverview)]]
'''~+Overview+~'''[[BR]]
Below you find a diagram of the overall steering process, followed by references to description of each process and role referenced in the diagram.
The overall steering process is presented in diagramatical form where squares denotes processes (main processes are denoted by double square) and the responsible role is indicated with a small drawing. The diagrams are accompanied with a table with links to the referred processes and roles.
Line 11: Line 7:
Each square denotes a process (main processes are denoted by double square), and the responsible role is indicated with a small drawing (to be extended later).

[[Anchor(OverallSCProcesses)]]
'''~+Processes+~'''[[BR]]
 * [:Process/Main_Activities_Suggestion:Main Activities Suggestion]
 * [:Process/Strategy:Strategy]
 * [:Process/Iteration_Lifecycle:Iteration Life-Cycle]

[[Anchor(OverallSCRoles)]]
'''~+Roles+~'''[[BR]]
 * [:Process_Role/Project_Leader: Project Leader]
 * [:Process_Role/Steering_Committee:Steering Committee]
||'''Processes''' ||'''Roles''' ||
||[:Process/Main_Activities_Suggestion:Main Activities Suggestion] || attachment:project_leader.gif [:Process_Role/Project_Leader: Project Leader] ||
||[:Process/Strategy:Strategy] || attachment:steering_committee.gif [:Process_Role/Steering_Committee:Steering Committee] ||
||[:Process/Iteration_Lifecycle:Iteration Life-Cycle] || ||

Action(edit)

The overall steering process is presented in diagramatical form where squares denotes processes (main processes are denoted by double square) and the responsible role is indicated with a small drawing. The diagrams are accompanied with a table with links to the referred processes and roles.

attachment:process_Overall_Steering.gif

Processes

Roles

[:Process/Main_Activities_Suggestion:Main Activities Suggestion]

attachment:project_leader.gif [:Process_Role/Project_Leader: Project Leader]

[:Process/Strategy:Strategy]

attachment:steering_committee.gif [:Process_Role/Steering_Committee:Steering Committee]

[:Process/Iteration_Lifecycle:Iteration Life-Cycle]

Process/Overall Steering Processes WithoutTitle (last edited 2010-08-16 10:24:29 by localhost)