Differences between revisions 7 and 8
Revision 7 as of 2009-05-12 12:53:55
Size: 1042
Editor: EldZierau
Comment:
Revision 8 as of 2009-05-12 12:56:09
Size: 1168
Editor: EldZierau
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:

TODO: Take Time, responsible and backup from http://kb-prod-udv-001.kb.dk/twiki/bin/view/Netarkiv/CurrentUdviklingsMetodik

Action(edit)

TODO: Take translated Overall_Steering part of http://kb-prod-udv-001.kb.dk/twiki/bin/view/Netarkiv/CurrentUdviklingsMetodik

TODO: Take Time, responsible and backup from http://kb-prod-udv-001.kb.dk/twiki/bin/view/Netarkiv/CurrentUdviklingsMetodik

The overall steering process contains [#OverallSCOverview Overview], [#OverallSCProcesses Processes], [#OverallSCRoles Roles].

Anchor(OverallSCOverview) OverviewBR Below you find a diagram of the overall steering process, followed by references to description of each process and role referenced in the diagram.

attachment:process_Overall_Steering.gif

Each square denotes a process (main processes are denoted by double square), and the responsible role is indicated with a small drawing (to be extended later).

Anchor(OverallSCProcesses) ProcessesBR

  • [:Process/Strategy:Strategy]

  • [:Process/Main_Activities_Suggestion:Main Activities Suggestion]
  • [:Process/Iteration_Lifecycle:Iteration Life-Cycle]

Anchor(OverallSCRoles) RolesBR

  • [:Process_Role/Project_Leader: Project Leader]
  • Steering Committee

Process/Overall Steering Processes WithoutTitle (last edited 2010-08-16 10:24:29 by localhost)