Differences between revisions 36 and 37
Revision 36 as of 2009-08-05 15:30:37
Size: 1390
Comment:
Revision 37 as of 2010-08-16 10:24:32
Size: 1397
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
[[Anchor(Methodology)]] <<Anchor(Methodology)>>
Line 4: Line 4:
[[Action(edit)]] <<Action(edit)>>
Line 6: Line 6:
The development methodology described here is inspired by CMMI (http://www.sei.cmu.edu/cmmi/). It will be described in form of [#Processes processes] and [#Roles roles]. The development methodology described here is inspired by CMMI (http://www.sei.cmu.edu/cmmi/). It will be described in form of [[#Processes|processes]] and [[#Roles|roles]].
Line 12: Line 12:
To insert a new process or role description, please refer to the [:Guidelines/NewProcess:Guidelines for Writing a new Process or Role]. To insert a new process or role description, please refer to the [[Guidelines/NewProcess|Guidelines for Writing a new Process or Role]].
Line 14: Line 14:
[[Anchor(Processes)]] <<Anchor(Processes)>>
Line 17: Line 17:
[[Include(Process/Intro_WithoutTitle)]] <<Include(Process/Intro_WithoutTitle)>>
Line 19: Line 19:
To get the page with all process descriptions in structured form, please refer to [:Process:All Processes]. To get the page with all process descriptions in structured form, please refer to [[Process|All Processes]].
Line 21: Line 21:
[[Include(Process/ProcessList_WithoutTitle)]] <<Include(Process/ProcessList_WithoutTitle)>>
Line 23: Line 23:
[[Anchor(Roles)]] <<Anchor(Roles)>>
Line 26: Line 26:
[[Include(Process_Role/Intro_WithoutTitle)]] <<Include(Process_Role/Intro_WithoutTitle)>>
Line 28: Line 28:
To get the page with descriptions of all our roles, please refer to [:Process Role:All Roles page]. To get the page with descriptions of all our roles, please refer to [[Process Role|All Roles page]].
Line 30: Line 30:
[[Include(Process_Role/RoleList_WithoutTitle)]] <<Include(Process_Role/RoleList_WithoutTitle)>>

Development Methodology

edit

The development methodology described here is inspired by CMMI (http://www.sei.cmu.edu/cmmi/). It will be described in form of processes and roles.

The processes are either main processes or subprocesses covered by a main process. Each main process includes an overview and the processes and roles involved. Each subprocess includes a description, a purpose, the role responsible for the subprocess, the method used in form of activities, the time it takes place and its input and output.

Each role includes a description, the processes the role is responsible for, and the guidelines relevant for the role, any references to current work and backup staffing list.

To insert a new process or role description, please refer to the Guidelines for Writing a new Process or Role.

Processes

To get the page with all process descriptions in structured form, please refer to All Processes.

Roles

To get the page with descriptions of all our roles, please refer to All Roles page.

Development/Methodology (last edited 2010-08-16 10:24:32 by localhost)