TEST1: Std-1 (Normal installation and systemstart, basic start and stop of selectiv-, event- and snapshot harvesting, scheduling, deduplication) #TestOne

Testgoals: Test basic start and stop of selectiv-,event- and snapshot harvesting, scheduling and deduplication

To testwriters: This test should not contain non-standard snapshotharvesting behavior. After install it should not be necessary to use shell script or commandline statements.

Follow the instructions in the section 10. Easy Installation of NetarchiveSuite in Installation manual

If you are netarkiv.dk tester, then follow these instructions : Netarkiv Standard Installation setup

Items

Status 1

Status 2

Status 3

Notes

Known open bugs

Bugs tested

New bugs found

Previous bugs

1. Check of monitoring and basis settings

OK

976, 977,978, 997,1469

2. Define and run selective harvest

OK

875,900, 953, 977, 980, 984, 994, 939, 984, 1044, 915, 1091, 1182, 1839

3. Define and run an event harvest

OK

861

4. Verify that the harvest is activated and done

OK


1038, 1053, 1010, 897, 1099, FR 1108, 1485, 1146, 1969, 1970, NAS-1852

5. Overrride the next schedule of the next job

OK

6. Verify that the event harvest is activated and done

OK

998

7. Browse in data from the first event harvest only

Partial OK, NAS-2076 still not fixed

1000

8. Browse in data from the second event harvest only

Partial OK, NAS-2076 still not fixed

9. Browse in data from the selective harvest only

OK

932

10. Check , that objects are deduplicated

OK

Test description refers to a not-yet-run snapshot harvest. Check instead harvestRun 1 of the event harvest. Both jobs have the deduplication-reports, that documents deduplication

11. Define and run a selective harvest

OK

Need to make the selective harvest take longer, so it is possible to stop before the job is finished. Make configuration for netarkivet using the default_orderxml_ lowbandwidth

861

12. Go to Heritrix GUI, verify the job is running and "Terminate" the job

OK

13. Go to Job Details view in ADM GUI and check the domain is stopped due to "Harvesting aborted"

OK

See notes to the left. Note that the Job is done, but the domain is stopped due to "harvesting aborted"

But the job has status DONE. Is that OK? The step 13 doesn't specify the state

14. Start a snapshot harvest with max 100000 bytes

OK

Step 13A. Replace the default_order_xml with default_orderxml_lowbandwidth to make it possible to stop before everything is finished

have changed the description, so the max is 1 mbyte instead of 100 Kbytes

15. Go to Heritrix GUI, verify the job is running and "Terminate" the job

OK

NAS-1860

2075

16. Go to the Job Details view in ADM GUI and check the job is stopped due to "Harvesting aborted" for some domains

OK

NAS-1980

17. Start a snapshot harvest with max 100000 bytes based on the previous terminated job

OK

18. Verify that harvest and archiving is done and the previous aborted domains are not archived

OK

If you are netarkiv.dk tester, here is the shutdown instructions: Shutdown the system

TEST1 (last edited 2013-05-03 16:42:56 by SoerenCarlsen)