4441
Comment:
|
← Revision 196 as of 2013-05-03 16:42:56 ⇥
4450
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
||[[It11DefineEventHarvest|3. Define and run an event harvest]] ||OK|| || || || || || ||861 || ||[[It15VerifyNormalOps|4. Verify that the harvest is activated and done]] || || || || || || || ||1038, 1053, 1010, 897, 1099, FR 1108, 1485, 1146, 1969, 1970, [[https://sbforge.org/jira/browse/NAS-1852|NAS-1852]] || ||[[It30OverrideScheduleJobs|5. Overrride the next schedule of the next job]] || || || || || || || || || ||[[It17VerifyNormalOps|6. Verify that the event harvest is activated and done]] || || || || || || || ||998 || |
||[[It11DefineEventHarvest|3. Define and run an event harvest]] ||OK || || || || || || ||861 || ||[[It15VerifyNormalOps|4. Verify that the harvest is activated and done]] ||OK||<<BR>>|| || || || || ||1038, 1053, 1010, 897, 1099, FR 1108, 1485, 1146, 1969, 1970, [[https://sbforge.org/jira/browse/NAS-1852|NAS-1852]] || ||[[It30OverrideScheduleJobs|5. Overrride the next schedule of the next job]] ||OK|| || || || || || || || ||[[It17VerifyNormalOps|6. Verify that the event harvest is activated and done]] ||OK|| || || || || || ||998 || |
TEST1: Std-1 (Normal installation and systemstart, basic start and stop of selectiv-, event- and snapshot harvesting, scheduling, deduplication) #TestOne
Testgoals: Test basic start and stop of selectiv-,event- and snapshot harvesting, scheduling and deduplication
To testwriters: This test should not contain non-standard snapshotharvesting behavior. After install it should not be necessary to use shell script or commandline statements.
Follow the instructions in the section 10. Easy Installation of NetarchiveSuite in Installation manual
If you are netarkiv.dk tester, then follow these instructions : Netarkiv Standard Installation setup
Items |
Status 1 |
Status 2 |
Status 3 |
Notes |
Known open bugs |
Bugs tested |
New bugs found |
Previous bugs |
OK |
|
|
|
|
|
|
976, 977,978, 997,1469 |
|
OK |
|
|
|
|
|
|
875,900, 953, 977, 980, 984, 994, 939, 984, 1044, 915, 1091, 1182, 1839 |
|
OK |
|
|
|
|
|
|
861 |
|
OK |
|
|
|
|
|
|
1038, 1053, 1010, 897, 1099, FR 1108, 1485, 1146, 1969, 1970, NAS-1852 |
|
OK |
|
|
|
|
|
|
|
|
OK |
|
|
|
|
|
|
998 |
|
Partial OK, NAS-2076 still not fixed |
|
|
|
|
|
|
1000 |
|
Partial OK, NAS-2076 still not fixed |
|
|
|
|
|
|
|
|
OK |
|
|
|
|
|
|
932 |
|
OK |
|
|
Test description refers to a not-yet-run snapshot harvest. Check instead harvestRun 1 of the event harvest. Both jobs have the deduplication-reports, that documents deduplication |
|
|
|
|
|
OK |
|
|
Need to make the selective harvest take longer, so it is possible to stop before the job is finished. Make configuration for netarkivet using the default_orderxml_ lowbandwidth |
|
|
|
861 |
|
12. Go to Heritrix GUI, verify the job is running and "Terminate" the job |
OK |
|
|
|
|
|
|
|
13. Go to Job Details view in ADM GUI and check the domain is stopped due to "Harvesting aborted" |
OK |
See notes to the left. Note that the Job is done, but the domain is stopped due to "harvesting aborted" |
|
But the job has status DONE. Is that OK? The step 13 doesn't specify the state |
|
|
|
|
OK |
Step 13A. Replace the default_order_xml with default_orderxml_lowbandwidth to make it possible to stop before everything is finished |
|
have changed the description, so the max is 1 mbyte instead of 100 Kbytes |
|
|
|
|
|
15. Go to Heritrix GUI, verify the job is running and "Terminate" the job |
OK |
|
|
|
|
|
2075 |
|
OK |
|
|
|
|
|
|
||
17. Start a snapshot harvest with max 100000 bytes based on the previous terminated job |
OK |
|
|
|
|
|
|
|
18. Verify that harvest and archiving is done and the previous aborted domains are not archived |
OK |
|
|
|
|
|
If you are netarkiv.dk tester, here is the shutdown instructions: Shutdown the system